Implementation of drainage system in Vitus residential project

Designing the drainage system of Vitus residential project is an essential step for standard infrastructure. Vitus residential towers project is located facing Nowshahr port and very close to the sea. Due to the high level of underground water in this place, it is necessary to drain the land before excavating and implementing the foundation. With the use of drainage, suitable conditions can be provided to remove excess water, and it stabilizes the soil and stabilizes it.

The implementation of the drainage system includes the implementation of several sub-wells and one main well. Then, canals are built throughout the land to collect underground water and direct it to the wells. Finally, the water collected in each of the wells is transferred to the main well and directed out of the project by the pump, and it provides the initial conditions for soil removal and then the implementation of the foundation.

Vitus residential towers are under construction in Nowshahr city and near the port. This project is designed with eye-catching architecture and in accordance with the context and has a unique view of the sea and the beautiful city of Nowshahr.

Vitus has 10 residential floors on the ground floor with an approximate infrastructure of 37,000 square meters, which includes 134 residential units and 2 commercial units facing the port. Vitus Towers has 222 parking spaces on the 1st to 3rd floors. This project is integrated up to the third floor and three towers from the fourth floor.

Click to read more about this project:

Vitus residential towers

For more information about the sales conditions of the project, contact:

09123865555